Plan Development Failed

This is the flow of events through standard order fulfillment with AOPD indicating that the order is not valid for plan development. The sequence is shown in the following diagram:

Standard Order Fulfillment – Plan Development Failed Sequence

Standard Order Fulfillment – Plan Development Failed Sequence

  1. The order is submitted from Order Entry through the Orchestrator Submit Order interface. Note that this may use intermediate service layers. The order now has Start status.
  2. Orchestrator sends a request to Transient Data Store to store the order. The order now has Submitted status.
  3. Transient Data Store saves the order and returns a response to Orchestrator. The order now has Feasibility status.
  4. If feasibility is enabled, Orchestrator sends a request to the Feasibility Provider to perform feasibility checking on the order.
    1. Feasibility Provider may delegate the feasibility checking call to Validation as well as perform some internal checking.
    2. Validation returns the result of the order validation back to Feasibility Provider.
    3. Feasibility Provider aggregates all order feasibility checks and concludes that the order is feasible and sends a response back to Orchestrator.
  5. If feasibility is not enabled or the Feasibility Provider has returned the result then the order status is now Plan Development.
  6. Orchestrator sends a request to AOPD to analyze the order and design an execution plan.
  7. AOPD sends a response back to Orchestrator indicating the order is not valid for plan design. The order status is now Pre-Qualification Failed.
  8. Orchestrator sends the order and the validation messages from AOPD to the Pre-Qualification Failed Handler for manual intervention.
  9. Pre-Qualification Failed Handler sends a response back to Orchestrator with one of two possible actions:
    1. Withdraw the order, which will terminate execution and the order status is now Withdrawn.
    2. Resubmit the order with an updated version. This flow continues as a normal order amendment flow.