Predictive Jeopardy

Predictive jeopardy is measured on several metrics:

Plan Item Start Date Plan Duration
For plan item milestones with both point and time dependencies, it is possible that the specified time dependency is not feasible based on the durations of the previously executed plan items that form the point dependencies on the same milestone The overall duration of the plan can be calculated by performing a critical path analysis on the plan items that compose the plan
Plan item start date predictive jeopardy determines whether the plan item will later than the specified start date due to the other dependencies Plan duration predictive jeopardy determines whether the execution duration of the plan will exceed the design duration of the plan