Plan Item Jeopardy
The following table lists the jeopardy conditions for the plan item:
Plan Item Jeopardy Conditions | Description |
---|---|
AFF-JM-PLANITEM-0100 | Plan item has exceeded typical duration |
AFF-JM-PLANITEM-0110 | Plan item has exceeded maximum duration |
AFF-JM-PLANITEM-0120 | Plan item has exceeded required start |
AFF-JM-PLANITEM-0200 | Plan item start is predicted to exceed required start and is increasing |
AFF-JM-PLANITEM-0210 | Plan item start is predicted to exceed required start and is decreasing |
AFF-JM-PLANITEM-0220 | Plan item is no longer predicted to exceed required start |
Copyright © Cloud Software Group, Inc. All rights reserved.