Performing Required Post-Installation Tasks

You must perform various tasks after creating a distributed ActiveMatrix BPM system.

Procedure

  1. Create Any Other Required LDAP Connections to LDAP Directories (if required)
  2. Configure Client Communications Through the Load Balancer
  3. Configure Transaction Recovery (Oracle only)
  4. Set Transaction Verification Property (SQL Server Only)
  5. Edit TIBCO Hawk® Rulebase Files
  6. Minimize Openspace Load Time
  7. Upgrade to Java Runtime Environment (JRE) 1.8