Issues When Starting the BPM Application
Important: Do not perform the Undeploy nor Force Undeploy operation on the BPM product application, which is named "amx.bpm.app" by default. Performing either of those operations on the BPM product application can cause the system to become unstable and/or unrecoverable, possibly requiring a re-creation of the environment.
- "OutOfMemory Native memory exhausted" Error on System Startup
When you attempt to start the ActiveMatrix BPM system, the System node and any BPM nodes fail with an "OutOfMemory Native memory exhausted" error.
- The BPM Application Cannot Connect
TheBPMapplication (by default named amx.bpm.app) cannot connect to Workspace, Openspace, or ActiveMatrix Administrator.
- Not Enough Disk Space
Sometimes even though the disk is not full, there may not be sufficient disk space to start theBPMapplication (by default named amx.bpm.app) .
- "OutOfMemory Native memory exhausted" Error on System Startup
When you attempt to start the ActiveMatrix BPM system, the System node and any BPM nodes fail with an "OutOfMemory Native memory exhausted" error. - The BPM Application Cannot Connect
The BPM application (by default named amx.bpm.app) cannot connect to Workspace, Openspace, or ActiveMatrix Administrator. - Not Enough Disk Space
Sometimes even though the disk is not full, there may not be sufficient disk space to start the BPM application (by default named amx.bpm.app) .
Copyright © Cloud Software Group, Inc. All rights reserved.