Uploading XSLT File
After you define the XSLT file for a throttle monitor, upload the file in the New ProcessBody XSLT field on facade Operations tab in the Config UI.
Procedure
- Start the GUI server, if not already running.
- Log in to the Config UI using your credentials.
- Add a new configuration or select an existing configuration.
- Click the ROUTING tab on the right hand side.
- Click the Facade Operations tab on the top menu.
- Add a new operation or choose an existing operation.
- Upload the XSLT transformation file to create a monitor as follows:
- Save the changes to the configuration.
Copyright © Cloud Software Group, Inc. All rights reserved.