Migrating Projects with SWIFT MX Activities
You can migrate your projects that use the previous SWIFT MX activities and the previous SWIFT standards to the current SWIFT standards.
- Procedure
- Uninstall the previous version of the plug-in.
- Install the new version of the plug-in.
- Download required
XSD files from the SWIFT website, and save them in the
TIB_BWPLUGINSWIFT_HOME\bin\xsd\year directory.
The XSD files must correspond to the message type schemas that are used in the existing project.
- Start TIBCO Business Studio.
- Click
- In the Import window, select and click Next.
- In the Import Projects window, you can select projects from the Select root directory or Select archive files.
- Click Finish to import the projects.
- In the General tab of the Load SWIFT MX Schema shared resource, click Unload Selected to unload message type schemas of the previous SWIFT MX standard release and then select the new SWIFT specification. For example, SWIFT November 2024 specification, from the Specification list.
- In the
General tab of the Parse SWIFT MX or Render SWIFT MX activity, configure the following fields as required:
- To clear the previous SWIFT specification, click Clear value.
- Click
Choose/Create Default Resource
next to the SWIFT Specification field to reload the SWIFT specification.
- To remove the dependencies that are generated from the SWIFT 2023 specification, click BW processes property.
- From the menu bar, click
to save the project.
Note: If an MX message used in existing projects is updated, you must update the corresponding MX message file accordingly.