Migrating Projects with SWIFT MT Activities

You can migrate your projects that use SWIFT MT activities and the previous SWIFT standards to the current SWIFT standards.

Procedure

  1. Uninstall the previous version of the plug-in.
  2. Install the new version of the plug-in.
  3. Start TIBCO Business Studio.
  4. Click File > Import
  5. In the Import window, select General > Existing Studio Projects into the Workspace and click Next.
  6. In the Import Projects window, you can select projects from the Select root directory or Select archive files.
  7. Click Finish to import the projects.
  8. In the General tab of the Load SWIFT MT Schema shared resource, click Unload Selected to unload message type schemas of the previous SWIFT MT standard release and then select the new SWIFT specification. For example, SWIFT November 2020 specification, from the Specification list.
  9. In the General tab, select the check boxes next to the corresponding message type schemas required by the existing project.
  10. Click Load Selected to reload the schema.
    Note: In SWIFT Standards Release 2020, structural changes in a SWIFT message can cause the mappings from the existing projects to break. Restore the broken links manually.