Adding Lines

Top  Previous  Next

Input flow lines indicate when an activity is triggered; output flow lines indicate when it's completed. Drag a flow line between activities to connect them.

Procedure

1.Click Edit diagram.

2.Click Drawing tools, and then Flow line tool.

3.Click and drag an area on the diagram to draw the line.

       Note: To connect two activities, click and drag from the inside of one activity to the inside of the other activity.

4.Type flow line text into the line, and then click in a blank space on the diagram to save.        

5.Click Save and then Done.