Display costs from a drill down |
![]() ![]() ![]() |
Activity-based costing is calculated on a single diagram basis, however it is possible to refresh the cost of a diagram from the child diagrams.
Note: This is not a live process and will therefore need to be repeated every time any child diagram costs are updated.
Note: This will only work if the Override Cost option is enabled.
|