Plan Summary Task Bar
|
Indicates the entire plan, from start till end.
|
Plan Item Summary Task Bar
|
Indicates the plan item covering all the milestones and sections of a plan item.
|
Milestone
|
Represented by a grey diamond.
|
Section
|
Indicates the START and END milestones part.
|
Duration
|
The two forecast types are shown at the section level:
- Typical Duration
.
- Maximum Duration
.
|
Critical Path
|
Indicates the path with maximum time duration. It is represented by the section bar with red border
. When you click the critical path option check-box on the top toolbar, only the critical path is shown with red border sections.
|
Tool tip
|
Shows the details of the respective GANTT item when you place the cursor over any GANTT chart items, for example, plan, plan item, section, milestone, typical or maximum duration icons.
|
Time and Point Dependencies
|
Time dependency: Represented by the
icon at the section level, if a section has started on the specified time dependency. If section start time has missed the specified time dependency, it is represented by the
icon.
Point dependency: Represented by connecting arrow. This is a unidirectional arrow which connects two milestones.
|