Setting the Project SRD (Seismic Reference Datum)

The last step to initialize the project is to define the SRD (Seismic Reference Datum).  This is the elevation (with respect to mean sea level) at which the seismic travel time is zero.  This must be set before any data is imported or exported via OpenSpirit as this is taken into account when seismic data or checkshots are transferred.

After completing all three steps of the project initiation wizard click on the Finish button and you will be prompted for a Petrel project name and path and a new empty Petrel project will be created with the desired preferences.

If the OpenSpirit settings option is enabled to "Start data selector when I click finish" then the OpenSpirit Data Selector will be launched. The Data Selector may then be used to select the desired projects and selected wells, seismic, interpretation and culture data.