Adapter Start Phase

When the adapter starts, it does these preparatory steps.

  1. The adapter reads the configuration file.
  2. The adapter contacts the FTL server to get the realm definition.
  3. The adapter validates its configuration.
  4. If the start phase succeeds in reaching this point, the adapter starts both its FTL side and its Rendezvous side.