Editing a Schedule

If you need to edit information for an existing schedule in Spotfire Metrics, follow these steps in Spotfire Metrics Modeler .

Perform this task from the Schedules tab.

Procedure

  1. From the list, highlight the schedule you want to edit, and then click Edit.
    The properties dialog for the selected schedule is displayed.
  2. Edit as necessary, and then click Save.
    Note: You cannot change the start date, but you can change the time the schedule runs again, and you can change the title, the description, the query, the time, and the frequency.

Result

The schedule is updated and its entry in the list reflects the changes.
Note: The date and time listed for Last Executed On is not reset, even if you change the query and the interval.