In the SANN Time Series (Regression) node dialog box, under the Results heading, select the Time Series tab to access the following options.
In time series problems, the objective is to predict (later) values of a variable or variables from a number of (earlier) values of the same or different variable or variables. In the most common case, a single variable is involved, and a number of sequential values are used to predict the next value in the same sequence (Bishop, 1995).
SANN supports a more general model: the input and output variable(s) do not have to be the same, and the prediction can be more than one step ahead.
Element Name | Description |
---|---|
Projection | Use the options in this group box to create time series predictions for the dependent variable for cases (time steps) within or outside the data set. |
Projection length | Specifies how many time steps (cases to predict) should be performed. There is no limit to how long a projection length could be, but it should not go more than a few time steps beyond the maximum number of cases in the data set. Like extrapolation in a regression problem, a projection length that reaches beyond the last case of the data set can produce results that may be unreliable. |
Case (starts from) | Specify the case from the data set to use as the start of the projection. Note that case numbers that are smaller than
Number of steps +
steps ahead cannot be predicted by the network since for such cases no complete input information is available.
Example: If your data set contains 50 cases and the Projection length and Case (start from) are set to 20 and 40, respectively, then your predictions start from case 40. Since there are only 50 cases in the data set, the last 10 of the time step predictions will be outside the range of the data set. |
Projection graph | Select this check box to create a graph of time series projections for the active networks. You can set the length and start point of the predictions using the options Projection length and Case (start from). |
Projection spreadsheet | Select this check box to create a spreadsheet of time series projections for the active networks. You can set the length and start point of the predictions using the options Projection length and Case (start from). |
Time series graph | Select this check box to generate the time series projection graph. |
Time series data | Select this check box to generate a spreadsheet containing the data from the projection.
Options / C / W. See Common Options. |
OK | Click the OK button to accept all the specifications made in the dialog box and to close it. The analysis results will be placed in the Reporting Documents node after running (updating) the project. |