After creating a project, you can add an SAP Connection shared resource to establish connections between the plug-in and the SAP system.
Prerequisites
The SAP Connection shared resource is available at the
Resources level. Ensure that you have created a project. See
Creating a Project for details.
Procedure
In the Project Explorer view, expand the created project.
Right-click the
Resources folder, and then click
New > SAP Connection to open the
SAP Connection wizard.
In the
New SAP Connection dialog, the resource folder, package name, and resource name of the SAP connection are provided by default. If you do not want to use the default configurations, change them accordingly. Click
Finish to open the SAP Connection editor.
Note:
In a project, all the SAP Connection shared resources cannot use the same name, even if the shared resources belong to different packages.
When the SAP Connection shared resource is created for the first time in a TIBCO ActiveMatrix BusinessWorks project, predefined module properties starting with SAP* are created. The predefined module properties must not be deleted.
In the
Client Connection panel, select a client connection type from the
Connection Type list.
In the Project Explorer view, expand the
Module Descriptors folder under the created project, and then double-click
Module Properties to open the Module Properties editor.
Specify the corresponding module properties inherited by the basic parameters of the client connection.
In the
Message Source Configuration tab, the configurations for Kafka or JMS can be added. For Kafka, the configurations need to be added at the shared resource level. For JMS, it can be added at the activity level or the shared resource level.