Testing Connectivity of TIBCO MDM BusinessWorks BusinessConnect

After the entire configuration is done, you can test the connectivity of TIBCO MDM BusinessWorks BusinessConnect.

Prerequisites

  • Have a ready to publish catalog in TIBCO MDM.
  • In TIBCO Designer, ensure the BW tester is running, check for Processes\Outbound\Send To TP Process, and all setup done.
  • The Binding file accessed by BW setup should have the IP of the machine from where testing has to be done.
  • The BC engine should be running and all setups should be done.

Procedure

  1. Open TIBCO Administrator.
  2. Publish product from TIBCO MDM.
  3. Check BW for Processes\Outbound\Send To TP Process, whether the message received, as the activities flow shows green.
  4. Check TIBCO Administrator for BC, in Log Viewer, for Audit Logs, for selected time range, whether the message reached and whether the message went out to the trading partner.
  5. Check for acknowledgement from the datapool.
  6. Check for response in BC, BW and TIBCO MDM eventLog.

    TIBCO BusinessConnect EZComm Protocol does not record advisory messages, such as the Responder Acknowledgement, in the audit log.